ieeepowertalks.com

Blackout Preventive Measures and Strategic Restoration in Oman Interconnected System

Key Themes Covered:

  • Power Sector in Oman
  • Types of System in Electricity Sector
  • Roles and Responsibilities of the Authority
  • Roles of Load Dispatch Centre (LDC)
    • During System Restoration
    • Planning Phase
  • System Restoration Procedures
  • Restoration strategies and Priorities
  • Blackout Preventive Measures
  • Steps in Enhancing Security
  • 5:30 - 5:40 PM

    Welcome note by the moderator

  •  Yaqoub Hamed Al Shamli 5:40 - 6:20 PM
    Yaqoub Hamed Al Shamli

    Blackout Preventive Measures and Strategic Restoration in Oman Interconnected System

  • 6:20 - 6:30 PM

    Discussion and Question & Answers

  • 6:30 PM

    Closing remarks

Speakers

Yaqoub Hamed Al Shamli

Network Operation Application Support Section Head Load Dispatch Center (LDC) - OETC